I. Project Overview
NODHA undertook the supply and technical service of core equipment for chemical pipeline cutting and beveling in the Oman TCC Ethylene Construction Project, which was commissioned by China National Chemical Engineering Third Construction Co., Ltd. The project is located in Oman and officially entered the construction phase in July 2018.
II. Technical Solution
NODHA provided two types of pneumatic motors, of which the ODP-762 pneumatic motor has a power of 3.77 horsepower and a torque of 117 Nm.
III. Implementation Results
Dual-machine collaborative operation improves processing efficiency by 42%
Dynamic torque compensation technology ensures ±0.1mm processing accuracy
High-temperature resistant components can operate stably at 65℃
Implement 24-hour remote technical support
IV. Project Value
Equipment operation data shows that energy consumption is reduced by 31% compared with traditional electric equipment.