Application
Our products are used in oil and gas, pressure vessels, shipbuilding nuclear and fossil fuels/electricity, steel structures, etc.

currentHome > Application > On Site Machining Equipment > Construction project of intermediate station in GaoMi

On Site Machining Equipment

Construction project of intermediate station in GaoMi


This project belongs to Shengli Oilfield and is located at Gaomi Intermediate Station in the Shengli Oilfield operating area. During the construction, X60 steel was selected as the pipe material. With its high strength, good toughness and weldability, X60 steel meets the stringent use requirements of oil pipelines. The pipe specifications are 28 inches in diameter and 18 mm in wall thickness, which can withstand large internal pressure and external loads.




It is worth mentioning that the construction team demonstrated excellent technical strength and innovative spirit. Using only one tool head, the construction task of 5 pipe ends was successfully completed. This achievement not only greatly shortened the construction time and reduced the tool loss cost, but also significantly improved the overall construction efficiency and greatly accelerated the advancement of the project.

 

Before working



After working


Related Application
lyLeave a Message
Contact us for a free quote and more expertise on pipe welding. You will get the right solution for your project with NODHA.